August 17, 2010
By: Falter
Category: Modern Architecture Design, architecture design building
S p o n s o r e d L i n k s
This new headquarters office of Blass, a company specializes in electromechanical, presents a structure with an overall impression that is homogeneous and closed. At first level, this modern office contains the sales division, the exhibition area, and section repairs. The second level houses all the administrative offices. To establish an optimal relationship between natural light, [...]
August 15, 2010
By: Falter
Category: Architecture Design Homes, Residential Architecture
Nested on a hill with a spectacular view over the river Bio-Bio in Chile, this L-shaped modern design of Concepcion House generates two tight facades that face the street and neighboring community, with two other facades that open onto a central courtyard and views over the gorge and the river. The modern structure of the [...]
August 14, 2010
By: Falter
Category: Modern Architecture Design, Unique Architecture Design, architecture design building
Glasgow Transport Museum was designed by Zaha Hadid Architects for the Glasgow City Council. The project was dated from 2004 to 2010. The museum’s landscape was designed to direct the activities surrounding the building and a ring of varying stones slabs is created as a shadow path around this amazing building architecture. Not only serve [...]
August 13, 2010
By: Falter
Category: Architecture Design Homes, Architecture Design Project, Residential Architecture
Tobias Partners Architects completed the Mooramie House project in Sydney, Australia. The main objective of the project was to build a new 2-storey rear addition of which the mass, proportion and its simple architectural expression are sympathetic and respectful to the existing building. The project details can be read in a few quote of the [...]
August 11, 2010
By: Falter
Category: Architecture Design Project, Modern Architecture Design, architecture design building
Aarhus Office is a new building for 240 offices and their clients. The project will be built as an extension of the administrative office building of the existing municipality, which dates from 1965. The complex will be located on the hillside south of the city and can stand obviously from the intersection of streets adjacent [...]